Projects

120 Crores

Executive Engineer, HUDA Division II, Panchkula.

Design right from DPR to checking of detailed engineering for 45 MLD Capacity Water Worksat Panchkula including Transmission Main.

200 Crores

Exe. Engineer, HUDA, Division No. III, Gurgaon

Consultancy work right from DPR to checking of detailed design & drawing for 1600, 1500 & 1400 mm ID rising main 33.4 KMS at Gurgaon.

500 Crores

Well Spun Ltd.

Consultancy work right from DPR to checking of detailed design & drawing for 117 MLD Capacity MPS & CETP for Ludhiana Dying Association.

130 Crores.

Ex. Engineer, HUDA Division No. 2, Faridabad

DPR for Master Storm Water for sector 75 to 89 at Faridabad.

220 Crores

Exe. Engineer, HUDA, Division No. II, Gurgaon

Consultancy work right from DPR to checking of detailed design & drawing for providing & laying of DI/ MS pipe line for
recirculation of tertiary treated effluent from 98 MLD, 50 MLD, 100 MLD & 120 MLD STP in Gurgaon.

250 Crores

Global Pace, Bhopal

Consultancy for Design of 160 MLD Water Treatment Plant at Gwalior

240 Crores

Gurugram Metropolitan Development Authority Gurugram

Consultancy for Design & Project Report for 22 MGD 2nd Water works at Basai Gurugram

200 Crores

Executive –V, Sew. Division, Infra-II, GMDA, Gurugram

Detailed Project Report for Design and Construction 225 MLD MPS & 100 MLD STP Based on Sequential Batch Reactor & Tertiary Treatment is under DPR Preparation Stage at Behrampur, Gurugram, Haryana.

128 Crores

Enviro Infrastructures Ltd.

Design, Engineering, Procurement, Construction, Installation, Testing, Commissioning of 10 MLD capacity Common Effluent Treatment Plant (CETP) with 120 months including defect liability period of 120 months operation & maintenance including chemicals for operation, trial run & testing, at Orisa.